NEWLY COMPLETED PROJECT

  •  2011-2012 LIST OF ON-GOING SERVICES
Client Project 

 

SEMIRARA-CALACA POWER CORP.

  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia and Technical Supervision for Rehabilitation and Modification of SMC Unit I Air Preheaters A & B. (P.O. No. : SMPO-0373223)
  • Supply of Labor, Tools, Equipment, Consumables as per SMC specified, Safety Paraphernalia & Technical Supervision for the Rehabilitation of Coal Burners, Elevation A-D, SMC, Plant Unit I.  (P.O. No. : SMPO-037893)
  • Supply of Labor, Tools, Equipment, Consumables as per SMC specified, Safety Paraphernalia & Technical Supervision for the Rehabilitation of Dead Space area, SMC Plant Unit I. (P.O. No. : SMPO-038782)
  • Supply of Labor, Tools, Equipment, Consumables, where SMC specified, Safety Paraphernalia & Technical Supervision for the Refurbishment of Coal Feeder A-D, SMC, Plant Unit I. (P.O. No. : SMPO-037304
  • Supply of Labor, Tools, Equipment, Consumables, as per SMC is specified, Safety Paraphernalia & Technical Supervision for the Repair / Replacement of Detached Insulation & Refractories installed underneath the Boiler Penthouse, including roof top casing / Housing front, Rear & Side Walls of Boiler, SMC Plant Unit I. (P.O. No. : SMPO-038803)
  • Supply of Labor, Tools, Equipment, Consumables, as per SMC specified Paraphernalia & Technical Supervision for installation of Scaffolding & Planks, Dismantling of Cladding & Insulations for Weldment joints, preparations for the inspection & Dye Penetrant of Hangers support in Main Stream Piping, Hot Reheat and____________ Dismantling of Scaffolding & Planks Follows. (P.O. No. : SMPO-039385)
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Replacement / Cleaning of Finishing Super-heater Header & Tubes using cap brush, and the Repair Finishing Super-heater Envelop & other Warp Roof Tube Casings. (P.O. No. : SMPO-038653)
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Installation of 16 Units Air Register Drive at Boiler Unit I. (P.O. No. : SMPO-039365)
  • Supply of Labor, Tools, Equipment, Consumables, as per SMC’s specified, Safety Paraphernalia & Technical Supervision for the Installation Scaffolding & Planks, Dismantling of Cladding & Insulations Preparations for NDT of all Weldment joints in Main Stream Piping Hot Reheat Cold Reheat Piping, Boiler & Turbine Areas, Rein. Of Insulations & Cladding, Dismantling of Scaffolding. (P.O. No. : SMPO-039386
  • Supply of Labor, Tools, Equipment, Consumables, as per SMC specified, Safety Paraphernalia & Technical Supervision for the Installation and Customized Scaffoldings inside all around the Boiler from Bottom parts up to Penthouse Area, SMC Plant Unit I. (P.O. No. : SMPO-037955)
  • Supply of Labor, Tools, Equipment, Consumables, as per SMC specified, Safety Paraphernalia & Technical Supervision for the Retightening of all Hanger installed at top of Boiler down to inside Penthouse are, SMC, Plant Unit I. (P.O. No. : SMPO-037870)
  • Supply of Labor, Tolls, Equipment, Consumables, as per SMC specified, Safety Paraphernalia & Technical Supervision for the Inspection / Replacement of Demister Pad and the Anti-Vortex, including the Stream Pipe Lines installed inside the Boiler Stream Drum, SMC Plant Unit I. (P.O. No. : SMPO-037316)
  • Supply of All Labor, Materials, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Repair / Reconditioning of Four (4) Units of Primary Super-heater and Re-heater Dampers and Total Replacement of its Worn-out Guzzet Plates, Supports & Brackets; Repair / Replacement/ re-installation of Erosion Shields at Economizer Tubes Area; Re-arrangement / Re-alignment of Four (4) Economizer Intermediate Panels and Inspection and Repair of Expansion Joints Located at the Top Portion of Economizer Dampers at Left and Right Sides of Sem – Calaca Power Corporation Unit I under SMPO-042470
  • Supply of Labor and Materials for the Installation, Testing and Commissioning of 11 Units capacity Damper at Boiler of Unit I. (P.O. No. : SMPO-039622)
  • Supply of Labor, Tools, Consumables as per SMC Specified, Safety Paraphernalia & Technical Supervision for the Installation of Scaffoldings & Dismantling, Preparation for the Installation of Insulation & Claddings at Blow down Tank Pipe Lines & Three(3) other Boiler Drain Pipes Installed at right side of Boiler Facing Smoke stack. (P.O. No. : SMPO-039994)
  • Supply of Labor, Tools, Equipment, Consumables that SMC specified, Safety Paraphernalia & Technical Supervision for the Demolition / Cleaning of Wet Type Bottom Ash Handling System, SMC Plant Unit I. (P.O. No. : SMPO-039951)
  • Supply of Labor, Tools, Equipment, Consumables, that SMC specified, Safety Paraphernalia & Technical Supervision for the Repair / Replacement of Castables installed Inside the Outside Wall Boiler Scoot-Blower and Wall-blower Boxes 96 pcs. SMC Plant Unit I. (P.O. No. : SMPO-040534)
  • Supply of Labor, Tools, Equipment, Consumables that SMC specified, Safety Paraphernalia & Technical Supervision for the Sandblasting & Painting of Pipes, Tubes, Supports and Structures inside Boiler Dead Space Area of SMC Plant Unit I. (P.O. No. : SMPO-040699)
  • Supply of All Labor, Tools, Equipment, Safety Paraphernalia & Technical Supervision for the Rehabilitation of Boiler Windbox, SEM –Calaca Power Corporation, Plant Unit # 1. (P.O. No. : SMPO-042291)
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision Required for the Corporation Unit I (W.O. No. : WO-001032)
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision Required for the Machining of Rotating Table of SEM-Calaca Power Corporation Unit I Pulverizer Alpha (W.O. No. : WO-001039)
  • Supply of All Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision Required for the Re[placement of Sacrificial Anodes Including Inspection, Cleaning & Repair of Seawater Pipe Stream Condenser A & B SEM-Calaca Power Corporation Unit I under Purchase Order No. WO-00969
  • Supply of All Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision Required for the Sandblasting of Eighteen (18) Units of Boiler’s Burner Throats of SEM-Calaca Power Corporation Plant Unit I under Purchase Order No. WO-000925.
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision Required for the Inspection & Repair of De-Super heater Spray Nozzle, Valve & Pipe Line of SEM-Calaca Power Corporation Unit I (W.O. No. : WO-000987)
  • Supply of Labor, Tools, Equipment, Consumable, & Technical Supervision Required for Reconditioning of Auxiliary Steam Isolation Valves of SEM-Calaca Power Corporation Unit I under Purchase Order No. WO-00933
  • Supply of Labor, Tools, Equipment, Consumable, & Technical Supervision required for the Repair / Replacement of Damaged / Eroded Pipes, Drain Headers / Lines, Supports & Components Installed Inside Steam Condenser of SEM-Calaca Power Corporation, Plant Unit I under P.O. No. WO-000893
  • Supply of Labor, Tools. Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Repair / Replacement of Castables Installed on all Boiler Manholes (34 pcs.) and Peepholes (53 pcs.) Including the Repair / Replacement of its own Cover’s Defective Parts such as Bolts / Nuts, Gaskets and Repainting Works, SEM-Calaca Power Corporation Plant Unit I (P.O. No. : SMPO-044592)
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Repair / Replacement of corroded Boiler Drain Pipe Lines & Valves, Boiler to Turbine areas under P.O. No. : SMPO-42114.
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Reconditioning / Overhauling of Heater Drain Pump, Plant Unit I, under P.O. No. WO-000945
  • Supply of Labor, Materials, Tools, Consumables. Safety Paraphernalia & Technical Supervision for the Supply & Fabrication of Aluminum Sheet Claddings Ga. 22 intended to Hot Reheat, Cold Reheat & Main Stream Pipe Lines, Plant Unit I, under P.O. No. : SMPO-041849
  • Supply of Labor & Insulation Materials (Calcium Silicate) for Main Stream, Hot Reheat & Cold Reheat Piping, including Cold reheat Lines from Turbine Chest to Cold Reheat Valves & Discharge Lines of Boiler Feed Pumps / Booster Pumps, under P.O. No. : 041848, Plant Unit I
  • Supply of Labor, Material, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Installation of Rockwool Insulation at Boiler Wall all around Boiler Area, under P.O. No. : SMPO-041043
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Repair / Re-Cleaning of Old Air Pre-Heater Baskets, Intermediate and Cold End, intended to Plant Unit I. (W.O. No. : WO-001181)
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Installation of Remaining Parts of Pulverizer Alpha, Plant Unit # 1 , under P.O. No. : WO-001040
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Overhauling of Spare Pulverizer Gearbox / Speed Reducer, Plant Unit # 1, under P.O. No. WO-001082
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision for the Replacement of Mill Alpha Gearbox & Overhauling of Pulled-out Gearbox / Speed Reducer (for spare), Plant Unit #1, under P.O. No. WO-001112
  • Supply of Labor, Tools, Equipment, Consumables, Safety Paraphernalia & Technical Supervision For the Additional Rehabilitation Works in Boiler Wall Insulation, Plant Unit I, under P.O. No. SMPO-044580