SEM-CALACA POWER CORPORATION

 

  • Supply of Labors & Installation, Tools, Equipment & Supervision necessary to complete the Rehabilitation of Burners & Air Register. (P.O. No. : WO-00136)
  • Supply of Labors, & Installation, Tools, Equipment & Supervision necessary to complete the Inspection/Repair of All Damaged Parts of Economizer Ash Evacuation System. Bottom Ash Hopper & Submerged Scrapper Conveyor. (P.O. No. : WO-0366)
  • Supply of Labors & Installation, Tools, Equipment & Supervision necessary to complete the Refurbishment of Coal Feeder Bravo to Echo. (P.O. No. : WO-00129)
  • Supply of Labors, & Installation, Tools, Equipment & Supervision necessary to complete the Replica of Piping. (P.O. No. : WO-00215)
  • Supply of Manpower, Safety Paraphernalia for the Re-Conditioning of Windbox Dampers & Positioners, Corner 1,2,3 & 4 Plant Unit II. (P.O. No. :WO-00157)
  • Supply of Labor, Tools, Equipment, Safety Paraphernalia & Technical Supervision for the Bolts Tightening of the Hangers Installed inside the Penthouse Area & the Top of the Boiler. (P.O. No. : WO-00554)
  • Supply of Labor, Tools, Equipment, Safety Paraphernalia & Technical Supervision for the following :
  1. Preparation for the replica in Various Pipes Installed at Boiler & Turbine Areas.
  2. Repair of deformed Spring Hanger & Installed I-Beam for Main Stream Pipe at Penthouse Area. (P.O. No. : WO-00580)
  • Ash & Dust Handling System. Rehabilitation of Clinker Grinder Assembly, Fabrication & Replacement of Slag Tank Flushing Line Corroded Sea Water Pipeline, Fittings & Valves. Fabrication & Replacement of Corroded level switch casing & base plate. (P.O. No. WO-00555)